摘要
FAST工程项目实施过程中,通过方案设计、优化设计、施工图设计及现场设计4个阶段,实时把握实际工程地质情况,采用动态设计与信息化施工的原则,合理判别危岩、崩塌堆积体的破坏模式,制定针对性的解决方案,成功解决了工程的复杂地质灾害难题。项目的成功实施获取了一套适用于岩溶洼地地质灾害治理的关键技术。
In the process of FAST project implementation,through the stage of project design,optimization design,construction drawing design and site design,the actual engineering geology had been grasped in real-time,the principle of dynamic design and information construction had been adopted,the failure modes of dangerous rock and avalanche deposit had been discriminated reasonably,the corresponding solutions had been made,and finally the problems of engineering complex geological disaster had been solved.A set of key technologies suitable for karst depressions geological disaster management had been gained by the success of the project implementation,and it provided the experience in the industry for management of geological disaster in similar area.
出处
《施工技术》
CAS
北大核心
2017年第14期128-133,共6页
Construction Technology
基金
贵州省科技计划项目(黔科合SY字(2014)3086)
关键词
建筑信息化
地质灾害
设计
施工
building informatization
geological disaster
design
construction