期刊文献+

水泥土挤密桩加固黄土隧道地基的稳定性研究 被引量:10

Stability Research of Loess Tunnel Subsoil Reinforced by Cement Soil Compaction Piles
下载PDF
导出
摘要 以郑西客运专线淹池至灵宝段盘东隧道为研究对象,对用水泥土挤密桩加固后的隧道地基在高速列车荷载作用下的沉降进行有限元分析,研究地下水、水泥土挤密桩加固对黄土隧道地基稳定性的影响。结果表明:在大断面黄土隧道中,水泥土挤密桩对控制黄土隧道地基沉降作用明显,尤其在富水条件下。研究结果可为水泥土挤密桩在黄土隧道地基加固中的应用提供科学指导。 Taking the Pandong tunnel of Yanchi to Lingbao section in Zhengzhou-Xi'an passenger dedicated line as the research object, the finite element analysis for the settlement of tunnel subsoil reinforced by cement soil compaction pile under the action of high speed train load was made, and the influence of groundwater and cement soil compaction pile reinforcement on loess tunnel subsoil stability was studied. The results show that the cement soil compaction pile has obvious effect on controlling the settlement of loess tunnel subsoil in large section loess tunnel, especially cement so in water-rich conditions. The research results could provide the scientific guidance for the application of il compaction pile in the loess tunnel subsoil reinforcement.
出处 《铁道建筑》 北大核心 2017年第7期85-87,共3页 Railway Engineering
关键词 湿陷性黄土隧道 水泥土挤密桩 有限元分析 地基 沉降 Collapsed loess tunnel Cement soil compaction pile Finite element analysis Subsoil Setdement
  • 相关文献

参考文献5

二级参考文献15

  • 1程琴辉,薛富春,马建林,喻渝,赵永明.初衬条件下大断面黄土隧道地基挤密桩施工振动监测与分析[J].高速铁路技术,2010,1(3):9-13. 被引量:6
  • 2JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 3TBl0204-2002,铁路隧道施工规范[S].
  • 4龚晓南.地基处理手册[M].3版.北京:中国建筑工业出版社,2008.
  • 5GB50025-2004.湿陷性黄土地区建筑规范.[S].,..
  • 6中华人民共和国建设部.GB50025-2004湿陷性黄土地区建筑规范[S].北京:中国建筑工业出版社,2004.
  • 7张振栓,王占雷,杨志红,等.夯实水泥土桩复合地基技术新进展[M].北京:中国建材工业出版社,2007.
  • 8中华人民共和国住房和城乡建设部.JGJ79-2012建筑地基处理技术规范[S].北京:中国建筑工业出版社,2012.
  • 9中铁西北科学研究院有限公司.小空间二次冲击挤密桩技术及其应用报告[R].兰州:中铁西北科学研究院有限公司.2010.
  • 10兰州铁路局,兰州交通大学,中铁西北科学研究院有限公司,铁道第一勘察设计院.西北地区湿陷性黄土路基变形特点及加固措施研究报告[R].兰州:兰州铁路局,兰州交通大学,中铁西北科学研究院有限公司;西安:铁道第一勘察设计院,2007.

共引文献48

同被引文献148

引证文献10

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部