期刊文献+

压水堆核电厂应对全厂断电的电源设计 被引量:8

The Power Supply Design to Deal with Station Blackout Failure in PWR NPP
下载PDF
导出
摘要 全厂断电是导致核电厂发生严重事故的主要初始事件之一,增强应对全厂断电的能力将进一步加强核电厂纵深防御,提高排出堆芯余热和保持安全壳完整性的能力,降低堆芯熔化概率,福岛核事故后核电厂更加重视提高全厂断电的应对能力。本文对我国现有核电堆型CPRl000核电厂及其改进型堆、AP1000核电厂、EPR核电厂在应对全厂断电工况时的电源设计情况进行总结说明。 Station blackout failure(SBO)is one of the major initial events leading to serious accidents in nuclear pow er plants,enhancing the ability to deal w ith SBO w ill further strengthen the nuclear pow er plant defense in depth,improve the ability to remove the core heat and maintain the integrity of the reactor,reduce the core melt probability,After the Fukushima accident,nuclear pow er plant pay more attention to improve the pow er of the plant's response capacity of SBO.The design of pow er supply of CPR1000 and evolutionary CPR1000,AP1000 and EPR nuclear pow er plant in China are summarized in this paper.
出处 《核安全》 2017年第1期75-81,共7页 Nuclear Safety
基金 环保公益性行业科研专项经费项目 项目编号:20130954
关键词 全厂断电 核电厂 交流电源 移动电源 AP1000 EPR SBO nuclear pow er plant AC pow er supply mobile pow er supply AP1000 EPR
  • 相关文献

参考文献8

二级参考文献26

  • 1陈兴江,谢坚,王学灵.EPR和CPR1000核电站水压试验泵的差异分析及选型研究[J].水泵技术,2013(4):37-42. 被引量:1
  • 2樊申.秦山核电厂全厂断电事故研究和厂外后果分析[D].
  • 3陈耀东.严重事故缓解措施对全厂断电(SBO)事故进程影响分析[J].
  • 4秦山核电厂最终安全分析报告[D].
  • 5魏文斌.秦山核电厂严重事故管理构想[J].
  • 6上海核工程研究设计院.秦山核电厂建设AAC电源的可行性研究报告[D].
  • 7APP-EDS-E8-OO1.Non-Class 1E DC and UPS System Specification Document.
  • 8APP-IDS-E8-O01 Class IE DC and UPS System Specification Dacument.
  • 9核工业第二研究设计院.岭澳二期工程严重事故对策报告[R].北京:核工业第二研究设计院,2006.
  • 10深圳中广核工程设计有限公司.红沿河严重事故对策报告[R].深圳:深圳中广核工程设计有限公司,2007.

共引文献59

同被引文献49

引证文献8

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部