特长铁路隧道机械化施工设备配套技术探讨 被引量:25

Discussion on Machinery Matching Technology for Mechanized Construction of Extra-long Railway Tunnel
下载PDF
导出
摘要 结合新建铁路黔江至张家界至常德线晏家堡二号隧道施工实践,初步探讨特长铁路隧道机械化施工和设备配套技术,得出机械化施工设备配套技术是关系到长大隧道施工成败的关键因素的结论。本隧道实现的快速掘进对今后的隧道施工具有很好的借鉴意义。 Taking the construction of No. 2 Yanjiabao Tunnel on newly-built Qianjiang-Zhangjiajie-Changde Railway as an example, the article preliminary discusses the mechanized construction and machinery matching technology for the extralong railway tunnel. It concludes that matching of the construction machinery is one of the most critical factors determining the success or failure of the construction for extra-long railway tunnel. The rapid driving of the tunnel will provide reference for similar tunnel works in the future.
作者 曹科
出处 《铁道建筑技术》 2017年第6期15-18,36,共5页 Railway Construction Technology
基金 中铁十八局集团有限公司科技研究开发计划项目(G16-14)
关键词 特长铁路隧道 机械化施工 设备配套 extra-long railway tunnel mechanized construction machinery matching
  • 相关文献

参考文献8

二级参考文献27

  • 1时亚昕,王明年.隧道仰拱快速施工技术[J].四川建筑,2004,24(5):108-109. 被引量:9
  • 2张丕界.长大隧道机械化施工设备配套技术[J].隧道建设,2006,26(1):39-43. 被引量:16
  • 3张群健.堡镇隧道有轨运输全幅仰拱桥设计与施工[J].隧道建设,2006,26(2):27-29. 被引量:5
  • 4JTJ042-2000 公路隧道施工技术规范[S].
  • 5王梦恕.大瑶山隧道修建世纪隧道修建新技术[M].广东:广东科技出版社,2004.
  • 6轩辕啸雯.大瑶山隧道机械化施工及存在问题的探讨[J].铁道建筑,1984(4):10-14.
  • 7赵华,谢大文,孙国新,等.铁路双线隧道施工机械化配套及效率分析[J].高速铁路技术,201l(S):23-27.
  • 8方俊波,黄嘉亿,洪开荣,等.长大隧道施工机械化配套技术与装备研究[J].高速铁路技术,2011(S):17-22.
  • 9刘青峰,单向华.铁路双线隧道工程机械化施工预算定额[M].北京:中国铁道出版社,2001.
  • 10铁建设[2010]241号,高速铁路隧道工程施工技术指南[S].

共引文献71

同被引文献116

引证文献25

二级引证文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部