摘要
结合新建铁路黔江至张家界至常德线晏家堡二号隧道施工实践,初步探讨特长铁路隧道机械化施工和设备配套技术,得出机械化施工设备配套技术是关系到长大隧道施工成败的关键因素的结论。本隧道实现的快速掘进对今后的隧道施工具有很好的借鉴意义。
Taking the construction of No. 2 Yanjiabao Tunnel on newly-built Qianjiang-Zhangjiajie-Changde Railway as an example, the article preliminary discusses the mechanized construction and machinery matching technology for the extralong railway tunnel. It concludes that matching of the construction machinery is one of the most critical factors determining the success or failure of the construction for extra-long railway tunnel. The rapid driving of the tunnel will provide reference for similar tunnel works in the future.
出处
《铁道建筑技术》
2017年第6期15-18,36,共5页
Railway Construction Technology
基金
中铁十八局集团有限公司科技研究开发计划项目(G16-14)
关键词
特长铁路隧道
机械化施工
设备配套
extra-long railway tunnel
mechanized construction
machinery matching