深埋长大隧洞高地应力岩爆段施工关键技术探讨 被引量:13

Discussion on Construction Key Technology of High Stress Rock Burst Sections in Deep-buried Long and Large Tunnel
下载PDF
导出
摘要 针对深埋隧洞高地应力岩爆的具体特征,结合现场实践进行试验论证和工艺改进,探讨在TBM法和钻爆法两种开挖方式下岩爆主动防治的方法,总结出了一套适用于高地应力岩爆段的施工应对措施和灾害控制技术,运用实施效果良好,可供类似工程参考。 Considering the features of high stress rock burst in deep-buried tunnel, this paper carries out demonstration testing and process improvement combining with field construction practice, and discusses active control methods for rock burst with two different tunnel excavation methods, namely the TBM method and drilling blast method. Then, a set of construction response measures and disaster control technologies for high stress rock burst tunnel sections are presented, achieving good effects. It can provide references for the similar projects.
作者 孙继红
出处 《铁道建筑技术》 2017年第6期103-107,共5页 Railway Construction Technology
关键词 深埋隧洞 岩爆 TBM 钻爆法 deep-buried tunnel rock burst TBM drilling blast method
  • 相关文献

参考文献12

二级参考文献61

共引文献132

同被引文献108

引证文献13

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部