摘要
造价是水利工程设计阶段的主要控制指标之一,在设计阶段的造价控制应采用技术和经济相结合的方法,以计划预防为主、纠偏为辅,在整个设计阶段应时刻进行主动把控才能取得良好的经济效益。对此,论文对水利工程在设计阶段的造价控制方法进行总结,以提高其造价控制水平。
Cost control is one of the main indexes of water conservancy engineering in design phase, in the design phase, the method of cost control should combine technical with economic, and we adhere the principle of rectification subject to planning and prevention, in the whole design phase should control the method actively in order to obtain good economic benefits. Therefore, paper summarizes the methods of cost control of water conservancy engineering in design phase, in order to improve the level of cost control.
出处
《工程建设与设计》
2017年第14期110-111,共2页
Construction & Design for Engineering
关键词
水利工程造价
设计阶段
控制方法
water conservancy project cost
design stage
control method