期刊文献+

基于BIM的全过程造价管理的实践与探索 被引量:1

Practice and Exploration of the Whole Process Cost Management Based on BIM
下载PDF
导出
摘要 传统的造价管理一直使用概预算定额管理模式,不能及时地整合工程动态信息,已经不能适应飞速发展的社会与日新月异的建筑市场。BIM虚拟技术的发展与应用,极大地颠覆了传统的造价模式,能在具体的、能够真切地感受到的建筑模型中实时调整工程数据,提高造价人员获取信息的及时性。基于此,论文对基于BIM的全过程造价管理进行探索。 The traditional cost management always uses the fixed budget management mode, it can not timely integrate dynamic information, it is not able to adapt the rapid development of society and change rapidly building market. The development and application of BIM virtual technology, which greatly subverts the traditional cost mode, this technology can adjust the data in time in the specific building model, it improves the efficiency of getting information for cost personnel. Based on this, paper explores the whole process cost management based on BIM.
作者 鲍仙君
出处 《工程建设与设计》 2017年第14期164-165,共2页 Construction & Design for Engineering
关键词 BIM 全过程造价管理 实践 探索 BIM whole process cost management practice exploration
  • 相关文献

参考文献2

二级参考文献6

共引文献14

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部