摘要
建设项目在实施过程中存在各种不确定因素,而现场签证便是解决各种不确定因素的重要手段。但现场签证通常会产生新的支出和费用,造成工程造价的增加。控制现场签证,以便控制工程造价。
There are various uncertainties in the process of construction project,and the on-site visa is an important means to solve various uncertain factors. However,on-site visas will usually generate new expenses,resulting in an increase in project costs. It should control the on-site visa,so as to control the project cost.
出处
《黑龙江科学》
2017年第13期11-12,共2页
Heilongjiang Science