期刊文献+

建筑机械设备安装工程的施工要点 被引量:1

Key points of construction of construction machinery and equipment installation
下载PDF
导出
摘要 机械设备安装的各环节互相依存,不能单一控制,安装时要注意调节组织间关系,促进各项目的协调,从而实现安装质量的最优化。建筑单位要加强对机械设备安装的管理,从而提升建筑管理水平。 The installation of mechanical equipment is interdependent,which can not be a single control,it should pay attention to adjust the relationship between the organization in the installation to promote the coordination of the project,in order to achieve the optimization of the installation quality. Construction units should strengthen the management of mechanical equipment installation,thereby enhancing the level of building management.
作者 胡英清
出处 《黑龙江科学》 2017年第12期162-163,共2页 Heilongjiang Science
关键词 建筑机械设备 安装 施工 Construction machinery and equipment Installation Construction
  • 相关文献

参考文献4

二级参考文献20

  • 1康建设,尹健.装备故障诊断、预测与信息管理[J].仪器仪表学报,2006,27(z2):1752-1754. 被引量:5
  • 2刘兆峰,徐进.无线射频识别(RFID)技术及其应用探讨[J].山东机械,2005(6):39-41. 被引量:10
  • 3Ali Motamedi and Amin Hammad. Lifecycle management of facilities components using radio frequency identification and building information model[J]. Journal of Information Technology in Construction, 2009 (14) : 238-262.
  • 4National Building Information Model Standard Project Corn-mittee, http ://www.buildingsmartalliance.org/index.php/nbims/ faq/.
  • 5Goedert, J. D., Meadati, P. Integrating construction process documents into Building Information Modeling[J]. Journal of Construction Engineering and Management,2008,134 (7) : 509-516.
  • 6朱艾路,谷芳,黄俭.RFID技术在混凝土质量检测中的应用[C].“全国混凝土新技术、新标准及工程应用”学术交流会,2010:363-368.
  • 7Pavan Meadati, Javier Irizarry, Amin K. Akhnoukh. BIM and RFID integration: A pilot study[C]. Advancing and Integrat- ing Construction Education, Research & Practice. Cairo, E- gypt: Proceedings of the Second International Conference on Construction in Developing Countries,2010:570-578.
  • 8WEI SHI. Framework for integration of BIM and RFID in steel construction[D]. University of Florida, 2009.
  • 9Xie, H., Shi, W., Issa, R. R. A. Implementation of BIM/RFID in computer-aided design-manufacturing- installation pro- cess[C]. IEEE Computer Society, Chengdu, China, 2010: 107-111.
  • 10A.M.ASCE, Farrokh Jazizadeh, et.al. Application areas and data requirements for BIM-Enabled facilities manage- ment[J]. Journal of Construction Engineering and Manage- ment, 2012 ( 138 ) : 431-442.

共引文献53

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部