6POLLETT P K. Modelling congestion in closed queueing net- works [J]. International Transactions in Operational Re- search, 2000,7(4/5) : 319-330.
7LAWRENCE S R, BUSS A H. Shifting production bottle- necks: causes, cures, and conundrums[J]. Production and Operations Management, 1994,3(1) :21-37.
8CHIANG S Y, KUO C T, LIM J T, et al. Improvability of assembly systems I: problem formulation and performance e- valuation[J]. Mathematical Problems in Engineering, 2000,6 (4) : 321-357.
9CHIANG S Y, KUO C T, LIM J T, et al. Improvability of assembly systems II: improvability indicators and case study [J ]. Mathematical Problems in Engineering, 2000, 6 ( 4 ) : 359-393.
10KUO C T, LIM J T, MEERKOV S M. Bottlenecks in serial production lines: a system-theoretic approach[J]. Mathemati- cal Problems in Engineering, 1996,2(3)..233-276.