摘要
山西省小浪底引黄工程是山西省大水网四大骨干工程之一,文中针对该工程引水干线的取水口、输水线路、地下泵站站址及机组选型、板涧河调蓄水库坝型进一步比选、优化和调整,保证了工程设计质量。
The Shanxi Province Xiaolangdi Yellow River Diversion Project is one of the four key projects in Shanxi Province.In this paper,further comparison,optimization and adjustment for water intake,water supply line,the underground pumping station site,unit selection and the dam type of the Banjian river adjust reservoir are made to ensure the quality of engineering design.
出处
《山西水利科技》
2017年第3期2-4,共3页
Shanxi Hydrotechnics
关键词
输水线路
设计方案
优化
water supply line
design scheme
optimization