柏叶口水库自2015年竣工验收以来,逐步由工程建设期转变为运行管理期。为保证大坝运行安全,大坝变形监测系统建立了人工和自动化设备相配合的工作体系,并按期进行沉降、位移观测,同时及时对监测资料进行分析判断,对可能存在的安全隐患做到早发现、早处理,确保工程安全。
Since finishing the completion acceptance of Baiyekou Reservoir's works in 2015,the reservoir's work has transform from the engineering constraction period into operation management period gradually.In order to ensure the safe operation of the dam,the dam deformation safety monitoring system has been established which combines the arificial equipments with automatic equipments,and the observation of dam's settlement and displacement proceeds on schedule.At the same time,the monitoring data are analyzed and judged in time. So the potential security risks should be found and treated early to ensure engineering safety.
出处
《山西水利科技》
2017年第3期39-41,共3页
Shanxi Hydrotechnics
关键词
柏叶口水库
变形监测
资料分析
Baiyekou Reservoir
deformation monitoring
data analysis