摘要
随着太原市城市化进程的加速,城市雨水资源利用成为水务工作的重点。基于雨水资源利用现状调查,对太原市雨水资源利用中存在的问题进行了分析,从工程措施和非工程措施两方面给出了加快太原市城市雨水资源利用的若干方法。文中研究内容可为缓解太原市水资源严重短缺问题提供借鉴。
As the acceleration of urbanization in Taiyuan City,it becomes important to use city rainwater resources in the work of water affairs. Based on present situation investigation for rainwater resources utilization,the problems in rainwater resources utilization in Taiyuan City are analyzed. The methods for accelerating rainwater resources utilization in Taiyuan City are given by structure measure and non-structure measure. This study could provide references for relieving the problem of water resources shortage in Taiyuan City.
出处
《山西水利科技》
2017年第3期58-61,共4页
Shanxi Hydrotechnics
基金
国家自然科学基金资助项目51509176
太原理工大学校基金资助项目2016QN39
关键词
雨水资源利用
太原市
工程措施
非工程措施
rainwater resources utilization
Taiyuan City
structure measure
non-structure measure