煤矿110kV变电站防雷电侵入波仿真研究 被引量:3

Simulation study on lightning protection intruding waves of 110kV transformer substation in coal mine
下载PDF
导出
摘要 通过利用电磁暂态软件ATP-EMTP建立完善的煤矿变电站仿真系统。通过模拟雷击变电站110 kV进线段情况,研究煤矿变电站主变压器周围避雷器安装位置不同时,其高低压侧与母线承受的雷电过电压幅值与持续时间进行仿真计算,并根据仿真计算得出的结果提出最优安装原则,使该变电站主变压器在受雷电侵入波影响时的过电压幅值最小。 Simulation system of substation was built through electromagnetic transient software ATP-EMTP. Based on simulating specific circumstances of 110 kV into line, the lightning arresters were installed on main transformer of a coal mine substation which were not in the same position, the high and low voltage side with the bus under the lightning overvoltage amplitude and duration were made simulation calculation. Optimal installation principles were put forward through these results, which could minimize the overvoltage magnitude at time of transformers suffering intruding wave in substation
作者 高维朝 Gao Weichao(Kexin College,llebei University of Engineering, Handan 05600~Chin)
出处 《煤炭与化工》 CAS 2017年第4期118-120,共3页 Coal and Chemical Industry
关键词 雷电侵入波 变电站防雷 防雷措施 lightning-intruding wave lightning protection in transformer substation lightning protection measures
  • 相关文献

参考文献5

二级参考文献35

共引文献234

同被引文献14

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部