期刊文献+

无锡新吴区现代有轨电车线网规划研究

Research on Modern Tram Network Planning in Wuxi Xinwu District
下载PDF
导出
摘要 结合对新吴区社会经济特征、城市规划、交通系统发展特征进行分析,论证了现代有轨电车在新吴区发展的必要性,并提出在新吴区构建以有轨电车为第二层次公交系统,作为轨道交通的补充和延伸。在此基础上,充分考虑轨道线网规划、城市发展引导、客流覆盖等因素,提出了新吴区有轨电车线网方案和分期实施方案,最后对有轨电车T1线先期线路进行了重点研究。 According to analyses about the social and economic characteristics, city planning, the development characteristics of transportation system of Xinwu District, this paper demonstrates the necessities of the development of modern tram in Xinwu District, and proposes the construction of the second levels of public transport system as a supplement and extension of rail transit, which is based on the tram. On this basis, the paper considers the factors such as the planning of railway network, the guidance of urban development and the coverage of passenger flow, and puts forward the tram network and the phased implementation plan, in the end, conducts in-depth study of early implementation section of T1 line.
作者 贾显超 JIA Xian-chao(China Railway Siyuan SurveyAnd Design Group Co.,Ltd., Wuhan 43006)
出处 《铁道勘测与设计》 2017年第2期29-32,共4页 Railway Survey and Design
关键词 现代有轨电车 线网规划 新吴区 公共交通 Modern Tram Rail Network Planning Xinwu District Public Transportation
  • 相关文献

参考文献4

二级参考文献24

  • 1徐正和.现代有轨电车的崛起与探索[J].现代城市轨道交通,2005(2):12-15. 被引量:46
  • 2[1]ALSTOM TRANSPORT.Tramways Tumkey Solutions[R].Shanghai:ALSTOM,2007
  • 3[2]ALSTOM TRANSPORT.现代有轨电车介绍[R].Shanghai:ALSTUM,2007
  • 4[3]LOHR GROUP.Translohr Tranmway On Tires[R].Shanghai:LOHR GROUP,2006
  • 5[4]ALSTOM TRANSPORT.Light Rail Solutions-Citadis[R].Shanghai:ALSTOM,2007
  • 6[5]上海市城市建设设计研究院.浦东张江有轨电车项目一期工程可行性研究报告[R].上海:上海市城市建设设计研究院,2007
  • 7[6]ALSTOM TRANSPORT.Citadis Wireless Tram[R].Shanghai:ALSTOM,2007
  • 8[8]ALSTOM TRANSPORT.Citadis Worldwide References[R].Shanghai:ALSTOM,2007
  • 9谢琨.观代有轨电车与城市建设[J].城中轨道交通研究,2000(1):62.
  • 10冯奎,郑明媚.中国新城新区发展报告[M].北京:中国发展出版社.2015:31-50.

共引文献193

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部