摘要
介绍了芜湖东编组站过渡开通时,三场与四场场间结合过渡设计方案,提出了编组站过渡开通时,场联电路设计思路,为类似工程的过渡设计提供参考。
The design of inter-yard combination of the third yard and the fourth yard for transitional operation of East Wuhu marshalling station is introduced. Some ideas about the design of liaison circuit between yards for transitional operation of marshalling station are given, providing references for similar projects.
出处
《铁道通信信号》
2017年第7期11-13,共3页
Railway Signalling & Communication
关键词
编组站开通
场间结合
过渡设计
Opening of marshalling station
Inter-yard combination
Design of transitional operation