摘要
地铁盾构法具有经济、快速、安全、机械化程度高等优点,是地铁区间隧道施工中常用的一种施工方法。在施工过程中,为了保证盾构施工顺利开展,提升地铁施工的综合效益,需要做好地铁区间隧道盾构施工的安全风险管理工作。以实际工程为例,对地铁区间隧道盾构施工中存在的安全风险进行分析,然后对隧道盾构施工安全风险管理措施进行探讨,以期为类似工程提供借鉴。
The metro shield method has the advantages of economy, rapidness, safety and high mechanization level, and is a common construction method in the tunnel construction of metro. In the construction process, it is required to carry out the safety risk management of tunnel shield construction in metro well in order to guarantee the smooth implementation of shield construction and upgrade the comprehensive benefit of metro construction. Taking a practical project as an example, the article analyzes the safety risk in the tunnel shield construction of metro and discusses the management measures for the safety risk in the tunnel shield construction in order to provide the reference for the similar projects.
出处
《城市道桥与防洪》
2017年第8期207-209,共3页
Urban Roads Bridges & Flood Control
关键词
盾构施工
风险管理
安全风险
盾构掘进
shield construction
risk management
safety risk
shield tunneling