摘要
某单层屋面抗风揭设计时,根据实际风压、风速、地形系数、阵风系数等因素计算设计荷载值,选用相同高分子卷材及紧固件,按照GB 50009—2012《建筑结构荷载规范》及FM 1-28风荷载规定这两种规范文件的不同逻辑思路确定屋面紧固件排布,并进行了比较。同时介绍了该屋面采用1.2 mm厚聚酯纤维内增强型PVC防水卷材进行无穿孔机械固定的施工工艺。
As per actual wind pressure, wind speed, topographie coefficient, gustiness factors el cetera, the wind uplift resistance design of some single ply roof employs the same polymer membrane and fasteners. It arranges the fasteners respectively according to the different logic thinking of GB 50009--2012 "Load code for the design of building structures" and FM 1-28 wind load regulations and compares the two methods. Meanwhile, the article introduces the construction technology of non-perforated mechanical thstening by polyester reinforced PVC waterproofing membrane of 1.2 mm thiekness.
作者
董剑
Dong Jian(Hongyuan Waterproof Group Polymer Business Department, Beijing 100176, China)
出处
《中国建筑防水》
2017年第15期1-5,9,共6页
China Building Waterproofing
关键词
单层屋面
抗风揭设计
国标规范
FM方法
紧固件
行距
株距
边角部加密布置
single ply roof
wind uplift resistance design
international standard
FM method
fastener: line spacing
row spacing
concentrated arrangement at marginal and corner locations