介绍了LNG储罐的试车过程,包括储罐及附属管线的干燥吹扫、储罐置换、储罐及附属管线的冷却和充液,分析了每个阶段的控制要求和操作要点。
The commissioning process of LNG tank was described, including drying and purging the tank and attached pipelines, replacement of the nitrogen in the tank, cooling down and filling the tank and attached pipelines.Control requirements and operational points of each phase was analyzed.