LNG储罐试车过程 被引量:1

The Commissioning Process of LNG Tank
下载PDF
导出
摘要 介绍了LNG储罐的试车过程,包括储罐及附属管线的干燥吹扫、储罐置换、储罐及附属管线的冷却和充液,分析了每个阶段的控制要求和操作要点。 The commissioning process of LNG tank was described, including drying and purging the tank and attached pipelines, replacement of the nitrogen in the tank, cooling down and filling the tank and attached pipelines.Control requirements and operational points of each phase was analyzed.
作者 巩志超 马凯 Gong Zhi-chao Ma Kai
出处 《化工设计通讯》 CAS 2017年第8期87-88,共2页 Chemical Engineering Design Communications
关键词 LNG储罐 试车 干燥 吹扫 置换 冷却 LNG tank commissioning drying purging replacement cooling down
  • 相关文献

参考文献1

二级参考文献2

  • 1张超,段常贵,谢翔,卫江升,张姝丽.LNG储罐排空时间的确定[J].煤气与热力,2006,26(7):1-4. 被引量:3
  • 2EN-14620-5 Design and manufacture of site built, vertical, cylindrical, flat-bottomed steel tanks for the storage of refrigerated, liquefied gases with operating temperatures between 0℃ and p165℃-Part 5: Testing, drying, purging and cooldown[S] .2006.

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部