中关铁矿帷幕注浆工程各序钻孔施工效率研究

Study of Boring Construction Efficiency of Zhongguan Iron Ore Curtain Grouting Project
下载PDF
导出
摘要 矿山帷幕注浆工程中注浆孔包括钻探、压水试验、注浆、扫孔、测斜、纠斜等多个施工工序,各工序对施工效率均有不同程度的影响。在系统整理中关铁矿帷幕注浆工程原始班报表的基础上,统计分析了各个工序之间相互关系及耗时比例,并针对其中关键环节,提出提高矿山帷幕注浆施工效率的具体措施。 A grouting hole in mine curtain grouting project involves a couple of construction procedures including drilling,water pressure test,grouting,drill-hole cleaning,bore-hole surveying and hole straightening and each procedure will have a different influence on construction efficiency.By systematically organizing original report forms of Zhongguan iron ore curtain grouting project,relation between different procedures and time percentage of each procedure is statistically analyzed.For key procedure,specific measures to improve construction efficiency of mine curtain grouting are put forward.
作者 王云 WANG Yun(North China Engineering Investigation Institute, Shijiazhuang 050021, China)
出处 《矿业工程》 CAS 2017年第3期23-25,共3页 Mining Engineering
关键词 帷幕注浆 施工工序 工序耗时 中关铁矿 curtain grouting construction procedure consumed time of procedure Zhongguan iron ore

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部