摘要
褐煤资源开发风险贯穿于煤矿项目规划前期、基本建设以及投产运行后的整个经营管理过程,深入风险分析对后褐煤资源煤矿项目建设具有重要现实意义与导向作用。
The risk of lignite resource development is through the early stage of coal mine project plan, the stage of infrastructure and the whole management stage after putting into production. An in-depth risk analysis would have important significance and be a guide to construction of lignite coal mine project.
作者
刘亮
LIU Liang(Huaneng Hulunbei'er Energy Development Co., Ltd., Hulunbei'er 021008, China)
出处
《露天采矿技术》
CAS
2017年第6期73-75,83,共4页
Opencast Mining Technology
关键词
褐煤资源
风险
对策
研究
lignite resource
risk
countermeasure
research