期刊文献+

大跨度组合连续宽箱梁顶推施工过程分析 被引量:1

ANALYSIS OF INCREMENTAL LAUNCHING CONSTRUCTION PROCESS OF LONG-SPAN COMPOSITE CONTINUOUS WIDE BOX GIRDERS
下载PDF
导出
摘要 以银川滨河黄河大桥西引桥为背景,阐述了连续组合宽箱梁的钢梁顶推架设过程,并采用有限元方法对钢梁架设过程进行了模拟,分析了顶推过程中最不利的工况,得到钢梁顶推过程中的静力及稳定特性。结果表明,采用顶推方法架设钢梁时,钢梁具有良好的静力及稳定性能。 Setting the west approach bridge of Yinchuan Yellow River bridge as background, the paper expounded the incremental launching process of steel beams of continuous composite wide box girders, and simulated the erecting process of steel beams by using finite element method and analyzed the most unfavorable load case in pushing process. The static and stability characteristics of steel beam in launching process were obtained. The results showed that the steel beams had favorable static and stability properties when they were erected by incremental launching method.
作者 许瑾
出处 《钢结构》 北大核心 2017年第7期107-110,共4页 Steel Construction
关键词 组合梁桥 顶推施工 有限元 受力特点 composite bridge incremental launching construction finite element mechanical characteristics
  • 相关文献

参考文献2

二级参考文献2

共引文献136

同被引文献9

引证文献1

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部