2Dongping Fang, Mingen Li. Risks in Chinese Construction Market-Contractors' Perspective[J ]. Journal of Construction Engineering and Management, 2004 ( 11/12 ) :853 - 861.
3J. H. M. Tah, V. Can'. Towards a framework for projectrisk knowledge management in the construction supplychain[J]. Advances in Engineering Software, 2001,32:835 - 846.
4YI Guangwang, QIN Huali. Fuzzy comprehensive evaluation of fire risk on high-rise buildings[J]. Procedia Engineering,2011 (10):64-90.
5WEI Bing, WANG Songling, LI Li. Fuzzy comprehensive evaluation of district heating systems[J]. Energy Policy, 2010(10):113-124.
6GU Xiangbai. Hierarchy probability cost analysis modelincorporate MAIMS principle for EPC project cost estimation[J].Expert Systems with Applications, 2011(07): 92-97.
7TAEWOO Nam, KEUNHYUK Yeom. Business-aware framework for supporting RFID-enabled applications in EPC Network[J]. Journal of Network and Computer Applications, 2011 (3):34-44.
8Adrian Georgescu, Nicoleta Alexandru, Andrei Constantinescu, et al. The promise of EPC-based therapies on vascular dysfunction in diabetes[J]. European Journal of Pharmacology,2011 (13): 121-132.