期刊文献+

独塔混合梁斜拉桥施工控制仿真分析 被引量:2

Simulation analysis of construction control for hybrid girder cable-stayed bridge with single tower
下载PDF
导出
摘要 以某独塔混合梁斜拉桥采用满堂支架法施工为例,介绍了其结构形式,进行了施工过程的仿真分析,结果表明,全部拉索张拉后钢箱梁截面最大应力沿纵向呈"S"形,但在施加桥面铺装后,钢箱梁受力变得均匀,索塔和主梁在施工过程中应力满足规范要求。 The structure configuration and for hybrid girder cable-stayed bridge with single tower were introduced,which was constructed using full framing cast-in-place method. The indices for construction control were calculated. The results show that the maximum stress of steel box girder along the longitudinal section is"S"type after all the cable tensioning. However,stress becomes uniform when the deck pavement is applied.The stress of cable tower and main girder in the construction procedures meet with the prescriptions of design code.
作者 渠广镇
出处 《山西建筑》 2017年第20期168-170,共3页 Shanxi Architecture
关键词 支架法施工 斜拉桥 混合梁 施工控制 仿真分析 full framing cast-in-place method cable-stayed bridge hybrid girder construction control simulation analysis
  • 相关文献

参考文献5

二级参考文献15

  • 1黄侨,吴红林,杨大伟.确定斜拉桥成桥索力多约束条件下最小能量法[J].哈尔滨工业大学学报,2007,39(2):288-291. 被引量:20
  • 2梁鹏,肖汝诚,孙斌.超大跨度斜拉桥几何非线性精细化分析[J].中国公路学报,2007,20(2):57-62. 被引量:13
  • 3李乔,杨兴旺,卜一之.特大跨度斜拉桥变形的几何非线性效应分析[J].西南交通大学学报,2007,42(2):133-137. 被引量:11
  • 4ERNST H J. Der E-Modul von seilen unter beruecksichtigung des durchhanges[J]. Der Bauingenieur, 1965,40 (2) : 52-55.
  • 5WAND P H, TSENG E C, YANG C G. Initial shape of cable-stayed bridges[J]. Computers & Structures, 1993,46 (6) : 1095-1106.
  • 6交通部规划设计院.GB/T50283-1999公路工程结构可靠度设计统一标准[S].北京:中国计划出版社,1999.
  • 7中华人民共和国铁道部.GB50216-1994铁路工程结构可靠度设计统一标准[s].北京:中国计划出版社,1994.
  • 8JTJ023-85.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,1985.48.
  • 9林元培.斜拉桥[M].北京:人民交通出版社,1993..
  • 10Walter P J, John B S. Construction and design of cable-stayed bridges(Second Edition) [M]. New York:JOHN WILEY & SONS, 1986.

共引文献58

同被引文献3

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部