期刊文献+

隧道施工中盾构机吊装对基坑支护结构稳定的影响 被引量:5

Influence of Shield Lifting on Supporting Structure of Pit During Tunnel Construction
下载PDF
导出
摘要 盾构机吊装是盾构法隧道施工中的重要步骤,由于盾构机本身体型大、荷载重、起吊时间短的特点,盾构机吊装成为隧道盾构施工过程中的一个危险因素。在盾构机吊装过程中,对连续墙的位移、支撑杆的轴向力和变形进行了实时监测,针对盾构起吊过程短暂、监测实施困难的特点,采用有限元分析法,将现场实测数据与有限元计算结果进行对比分析。研究结果表明:盾构机的吊装过程中,隧道开挖支护结构是安全稳定的,有限元分析方法也是有效的。此研究成果可为相似工况其他隧道工程中的盾构机吊装安全稳定分析提供参考。 Shield lifting is an imporiant p ro c ed u re in tu n n e l con s tru c tio n by sh ie ld m e thshield , heavy load and short lifting time , lifting proce ss becomes a big r is/ in sh ie ld tu n n e l c o n s tru c lifting process , the displa c ement of cont inuous wall , th e axial forces an d deformatioreal time. Finite element method(FEM ) was ap p l ied b e c au s e th e lifting proce ss is very short an d some monitoringprograms are difficult to be conduc te d. Re sults showed th a t th e d a ta from FEM proved to b e effective in comparison with measured data and the excavation is safe d u r in g th e shie ld u p l if t in g. The re se a rch resu lts provide re fe ren c e s for similar projects.
出处 《长江科学院院报》 CSCD 北大核心 2017年第8期125-129,134,共6页 Journal of Changjiang River Scientific Research Institute
基金 国家自然科学基金项目(51608174) 河南省科技发展计划项目(162102310603) 河南省科技攻关计划项目(152102310299)
关键词 盾构吊装 隧道施工 数值分析 监测数据 支护结构 基坑支护 shield l ift ing tunne l co n s tru c t io n n um e rical a n a ly s is monitoring d a t a su ppor ting stru ctu re
  • 相关文献

参考文献9

二级参考文献67

共引文献477

同被引文献33

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部