双江口水电站围堰防渗墙施工技术 被引量:9

Construction Technology of Shuangjiangkou Hydropower Station Cofferdam Cut-off Wall
下载PDF
导出
摘要 双江口水电站大坝为砾石土心墙堆石坝,最大坝高314m,是世界最高的心墙堆石坝工程。大坝上、下游围堰防渗墙的建造成败直接影响到大坝基础的开挖。主要介绍上、下游围堰防渗墙导墙下部覆盖层加固、巨漂孤石、倒悬体、超高陡坡地层的施工技术。 The dam of Shuangjiangkou hydro-power station is a rock fill clam with gravel-soil eore, and the dam is 314 meters high, which is the highest building in the world on this type. The construction quality of the cut-off wall for the up and downstream of the dam can direetly affect the excavation of the dam foundation. This paper mainly introduces the construction technologies of the covering layer reinforcement for the guide wall of the cut-off wall from the upstream and downstream of the cofferdam, the giant boulder, the overhanging structure and the ultra high abrupt slope stratum.
作者 徐勇 何烨
出处 《施工技术》 CAS 北大核心 2017年第15期96-98,103,共4页 Construction Technology
关键词 水电站 导墙 超高陡坡 加固 施工技术 hydropower stations guiding wall ultra high abrupt slope reinforcement construction
  • 相关文献

同被引文献46

引证文献9

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部