5Sulei Zhang, Dingli Zhang, Xiiaoming Dong. Safety Analysis of Subsea Tunnel Operation Management System Based on Fuzzy Comprehensive Evaluation Method[C]// International Conference on Engineer- ing and Business Management, 2010.
6Wen-jing XUE, Dong WANG, Lin- bing WANG. A Review and Perspective about Pavement Monitoring[J].International Journal of Pavement Research and Technology, 2012, (5) : 295 - 302.
7Morteza Pakdin Amiri. Project Selection for Ooil- fields Development by Using the AHP and Fuzzy TOPSIS Methods[J]. Expert Systems with Applica- tions, 2010,(1) :1-7.
8Nilson B, Palmstrom A, Stille H. Quality control of a sub- sea tunnel project in complex ground condition [ J ]. Challenges for the 21 ST century, 1992,17 ( 5 ) : 137-145.
9Sturk R, Olsson L,Johansson J. Risk and Decisionanalysis for large underground projects applied to the Stockholm ring road tunnel[ J ]. Tunneling and Under ground Space Technology, 1996,11 (2) : 157-164.