期刊文献+

观音湖隧道快速施工技术研究 被引量:1

Research on Rapid Construction Technology of Guanyin Lake Tunnel
下载PDF
导出
摘要 在涪江水系同步实施半闭半流和项目节点工期十分紧张的情况下,对遂宁观音湖隧道工程进行了重难点分析,介绍了如何科学组织、快速有序地选择施工方案,以投入多倍于常规的策略,重点突出"抢、快、严、优",实施湖中围堰、深基坑开挖与支护、模板与支架设计、清水混凝土浇筑、综合防水等关键技术,为类似工程提供借鉴。 Considering synchronous implementation of half-closing and half-flowing for the Fujiang River water system and highly tense schedule,the paper analyzed the emphasis and difficulties of Guanyin Lake Tunnel engineering in Suining,and introduced how to select the construction plan scientifically,rapidly and orderly,so as to put into times strategies of the conventional to highlight the characteristics of "rush,fast,strict and excellent". By implementing the key technologies such as cofferdam in lake,excavation and supporting of deep foundation pit,template and support design,concrete pouring and composite waterproof,it could provide reference for similar projects.
作者 任高峰
出处 《铁道建筑技术》 2017年第7期90-93,共4页 Railway Construction Technology
基金 中铁二十局集团有限公司科技研发项目(J13-06B)
关键词 隧道 明挖法 半闭半流 桩箱结构 综合防水 快速施工 tunnel open-cut method half-closing and half-flowing pile-box structure comprehensive waterproof rapid construction
  • 相关文献

参考文献8

二级参考文献29

共引文献45

同被引文献8

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部