摘要
某二级公路改建工程中有一半挖半填路段需作结构物支挡设计,文章以抗滑桩和挡土墙支挡的设计方案为基础,运用Midas/GTS二维数值模拟对两方案进行分析和对比,最终选定了最优设计方案,为类似工程设计和施工提供建议和参考。
A half-fill half-excavation section in a secondary road reconstruction project requires the structural support design.Based on the design scheme of anti-slide pile and retaining wall support,and by using the Midas/GTS two-dimensional numerical simulation, this article analyzed and compared both programs,and finally selected the optimal design scheme, which can provide suggestions and references for similar engineering design and construction.
作者
谢岗
黄庆玲
XIE Gang HUANG Qing-ling(Guangxi Guishang Industrial Investment Co., Ltd., Nanning, Guangxi, 530001 Guangxi Techno- logical College of Machinery and Electricity, Nanning, Guangxi, 530007)
出处
《西部交通科技》
2017年第7期33-37,76,共6页
Western China Communications Science & Technology