大跨径连续梁桥施工阶段风险因素探析

Discussion and Analysis on Risk Factor at the Construction Stage of Large-span Continuous Girder Bridge
下载PDF
导出
摘要 首先对桥梁结构施工过程中的风险源进行识别,分析了大跨径连续梁桥施工阶段的风险因素,分别从基础施工、主梁施工两方面归纳连续梁桥施工中具有的风险因素,再从人为风险、技术风险、自然风险三方面提出了相应的控制措施,最后以某大桥工程实际案例入手进行了具体分析。 The identification of risk source during the bridge structure construction is made firstly,the analysis on risk factor at the construction stage of large-span continuous girder bridge is made,the risk factor during the construction of continuous girder bridge is respectively summarized from two aspects like foundation construction,main girder construction,and then corresponding control measures are put forward from three aspects like human risk,technical risk and natural risk,and the analysis is made concretely at last by starting from the actual case of a bridge engineering.
作者 白晶晶
出处 《北方交通》 2017年第8期21-23,共3页 Northern Communications
关键词 大跨径 连续梁桥 施工阶段 风险因素 Large-span Continuous girder bridge Construction stage Risk factor
  • 相关文献

参考文献8

二级参考文献30

  • 1卜建清,娄国充,罗韶湘.汽车对桥梁冲击作用分析[J].振动与冲击,2007,26(1):52-55. 被引量:36
  • 2JTG/TB 02-01-2008,公路桥梁抗震设计细则[S].
  • 3薛孔宽 赵式本 黄桂英.空腔爆破-降低爆破震动的有效途径.爆破,1987,:23-26.
  • 4王淑波,袁万城,范力础.桥梁减隔震分析的弹性反应谱法[C]//中国土木工程学会桥梁及结构工程学会第十二届年会论文集:下册.1996.
  • 5JTGD60-2004.公路桥涵设计通用规范[S].[S].,..
  • 6范立础,胡世德,叶爱君.大跨度桥梁抗震[M].北京:人民交通出版社,2001.
  • 7杨振海,程维虎,张军舰.拟合优度检验[M].北京:科学出版社,2011.
  • 8姚波,郑青青.大跨径预应力连续梁桥悬臂浇筑施工监控[J].山西筑,2007,33(2):269-270.
  • 9McLean D I, Marsh M L. Bridges [ R]. Washington search Board, 1998. Dynamic Impact Factors for D C.. Transportation Re-.
  • 10Gao Q F, Wang Z L, Jia H Y, et al. Inspection and Evaluation Methods on Dynamic Performance of High- way Bridges under Moving Vehicular Loads[J]. The IES Journal Part A: Civil & Structural Engineering, 2015, 8(1): 71-79.

共引文献72

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部