分析了建筑工程项目从投资决策、设计、招投标、施工以及竣工验收等5个阶段的造价管理存在的问题,对项目可行性研究报告不完整、投资估算和初步设计概算不准确、工程设计有漏洞、施工招标文件编制质量不高、工程量清单编制有错漏、施工发包合同不规范、隐蔽工程的签证管理不到位、工程项目的结算价偏高等问题,提出了相应的解决方法及采取的对策。
The aim of this paper is to conduct an analysis of existing problems in cost management from five parts in construction projects,including investment decision phase,design phase,bidding phase,construction phase and project acceptance phase. Those problems like incomplete project feasibility study report,inaccurate estimation of investment and preliminary design cost,design loopholes,the poor quality of construction biding documents,faulty bill of quantities,nonstandard construction contract,inefficient visa management of concealed engineering and the high project settlement price were discussed. The corresponding solutions and countermeasure were put forward.
作者
张小红
ZHANG Xiaohong(Infrastructure Construction Department Fujian Normal University,Fuzhou 350117)
出处
《福建建筑》
2017年第8期103-105,117,共4页
Fujian Architecture & Construction
关键词
建筑工程造价
过程管理分析
对策
Construction cost
Process management analysis
Countermeasure