怒江昆钢水泥有限公司3200t/d新型干法熟料水泥生产线用地面积狭小,高差大,地形形状不规则,总平面规划设计难度较大。文章从五个方面详细介绍了中国中材国际工程股份有限公司在该项目极狭窄地形总平面设计中的解决方案,另外还介绍了其厂区物流组织和道路设计特点。该总平面布置充分考虑了现有场地的实际情况,总体紧凑,工艺流程顺畅,生产区域功能分明。
The production land area of the 3 200 t/d cement production line of Nujiang Kungang Cement Company project is very small, the height difference is large, and it has irregular topographic shape, which results In general plan design difficult. The paper introduces the general layout design measures of Sinoma International Engineering Co.,Ltd. for this extremely narrow terrain project, and introduces the plant logistics organization and the features of road design. The overall layout of the project takes full account of the actual situation of the site, which has compact layout, smooth process flow and clear functional production areas.
作者
吴昌义
于瑞彬
徐旻昊
种正江
Wu Changyi Yu Ruibin Xu Minhao Zhong Zhengjiang(Sinoma International Engineering Co.,Ltd., Nanjing, 211100, China)
出处
《水泥工程》
CAS
2017年第4期74-76,89,共4页
Cement Engineering
关键词
总图
平面规划
狭长地形
堆场储量
地形高差
道路
general layout
plane planning
narrow space
capacity of storage
height difference
road