摘要
介绍了悬臂施工技术及顶推施工技术在大跨径连续梁桥施工中的具体应用,并从地基处理、钢筋工程、混凝土浇筑等方面,阐述了大跨径连续梁桥的施工控制要点,从而保证大跨径连续梁桥的施工质量。
This paper introduced the specific application of cantilever construction technology and jacking construction technology in large span continuous beam bridge construction,and from the foundation treatment,steel reinforcement engineering,concrete pouring and other aspects,elaborated the construction control key points of long span continuous beam bridge,so as to ensure the construction quality of large span continuous beam bridge.
出处
《山西建筑》
2017年第21期137-138,共2页
Shanxi Architecture
关键词
大跨径
桥梁
预应力
混凝土
long span
bridge
pre-stressed
concrete