摘要
以和平站特大桥为例,通过选用321型贝雷梁作为主纵梁,配合5排螺旋管作为主支撑,跨河处采用型钢焊接为整体支架作为跨河支架的支撑结构,有效地解决了施工难题,为今后同类工程提供参考。
Taking the super-large bridge at Heping Station as the example,the paper selects type 321 bailey beam as the main longitudinal beam and 5-row spiral pipes as the main support,and adopts the steel welding general support as the support structure for the crossing-river support,so as to solve the construction difficulties and provide some reference for similar projects.
出处
《山西建筑》
2017年第21期145-146,共2页
Shanxi Architecture
关键词
河流
贝雷梁支架
现浇梁
预应力管桩
rivers
bailey beam support
cast-in-place beam
prestressed pipe pile