期刊文献+

梁北选煤厂有压重介旋流器分选系统工艺改造与优化 被引量:7

Technical renovation and optimization of the pressure-fed 3-product H.M.cyclone separating system at Liangbei Coal preparation Plant
下载PDF
导出
摘要 针对梁北选煤厂有压三产品重介质旋流器系统不稳定的现状,对系统设备及工艺参数进行了优化和改进,并对混料桶结构和出口方向进行了调整,优化了混料泵参数,将混料泵叶轮由90 mm增加到110 mm。改造后解决了矸石物料粒度大、混料桶矸石堆积以及混料泵通过量小的问题,通过实践证明,改造取得了良好的效果,可为有压重介质旋流器的生产控制提供一定借鉴与经验。 The trouble with the plant is the instability of the 3-product H. M. cyclone system in operation. Therefore,work is made on technical improvement and optimization of the process of the system.The work made includes,among others,the improvement of the structure of the mixing tank and adjustment of the direction of the tank's outlet,optimization of the parameters of the mixing pump and enlargement of the pump's flow channel from 90 mm to 110 mm. Practice shows that through the technical renovation,a remarkable result has been achieved,and the troubles previously encountered,such as blocking of cyclone's underflow orifice by large pieces of gangue materials,accumulation of gangue materials in mixing tank and deterioration of pump performance because of the limited size of its flow path,have been thoroughly eliminated. The experience gained may serve as a reference for the operation and control of the pressure-fed 3-product H. M. cyclone.
出处 《选煤技术》 CAS 2017年第3期27-30,共4页 Coal Preparation Technology
关键词 混料桶 混料泵 流道 稳定性 mixing tank mixing pump flow path stability
  • 相关文献

参考文献9

二级参考文献48

共引文献34

同被引文献44

引证文献7

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部