反应堆保护系统响应时间T2测试方案研究 被引量:1

Research of Test Scenario of T2 Response Time of Reactor Protection System
原文传递
导出
摘要 介绍了反应堆保护系统(RPR)响应时间T2的组成。针对保护通道响应时间T2测试逻辑复杂、大修工期短、测试理论要求高等特点,提出了信号路径全覆盖和卡件全覆盖2种测试方案,并分析比对2种测试方案的优缺点。最后通过对福清核电厂3次大修的实际测试,验证了测试方案的可行性。 The composing of the reactor protection system response time was introduced firstly. Considering the complex and difficulty of the test of RPS response time, and high requirement of test theory, two test schemes of all path converge test and all module converge test were introduced. The advantages and disadvantages of two schemes were analyzed. Through three tests during the outage in Fuqing Nuclear Power Plant. the feasibility of the test was proved.
出处 《核动力工程》 EI CAS CSCD 北大核心 2017年第4期116-119,共4页 Nuclear Power Engineering
关键词 T2响应时间测试 信号路径全覆盖 卡件全覆盖 Test of T2 response time, Signal paths converge test, Module converge test
  • 相关文献

参考文献1

二级参考文献1

  • 1中华人民共和国国家质量监督检验检疫总局.GB/T5204,核电厂安全系统定期试验与监测[S],2008.

共引文献4

同被引文献12

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部