摘要
依据大同市御河河道现状概况,分析了工程建设的必要性。根据实测资料,论述了工程设计洪峰、24h洪量及3d洪量。并在考虑了上游两座水库影响后,对设计断面洪水进行了分析计算。
Base on the present situation of Datong Yuhe River, this paper analyzes the necessity of engineering construc-tion. Based on available data, the calculation methods are discussed involving design flood peak, design flood volume in 24 hours and design flood volume in three days. Meanwhile the paper arrives at a conclusion which considers the effect of two upstream reservoirs.
出处
《水科学与工程技术》
2017年第4期26-29,共4页
Water Sciences and Engineering Technology
关键词
水库
实测资料
洪峰流量
洪量
reservoir
measured data
peak discharge
flood volume