摘要
在运输繁忙线路,半自动闭塞制式已不能适应铁路运输的需要,需逐步改造为自动闭塞制式,且新开通的区间闭塞分区要具有逻辑占用检查功能。结合管内曹南线半自动闭塞改造工程的施工,介绍联锁试验步骤及方法,保证区间自动闭塞区段联锁关系的绝对正确以及工程的顺利开通。
In busy lines of Chinese railway,semi-automatic block system is unable to meet the needs of railway transport.So,It is required that semi-automatic block system should be gradually transformed into automatic one.Meanwhile,the newly opening block system should has the function of logical check occupancy.In combination with the transformation project of semi-automatic block system in Caobeidian South line,the procedure and method of interlocking test are introduced,which ensure the absolute correctness of interlocking relationship and successful opening of the project.
出处
《铁道通信信号》
2017年第8期45-48,共4页
Railway Signalling & Communication
关键词
联锁试验
试验步骤
试验方法
Interlock test
Test procedure
Test methods