6Zaal P M T, Pool D M,Postema F N, et al. Design and Certi- fication of a Fly- By- Wire System with Minimal Impact on the Original Flight Controls [ R ]. AIAA -2009 -5985,2009.
7Zhang Lin, Ma Haiying, Deng Jianjun. Reliability Study of Disengaging Mechanism based on Fault Tree Analysis [ C ]. IEEE, Quality, Reliability, Risk, Maintenance, and safety En-gineering Conference ,2012:290 - 292.
8Qiang Guo. Novel Approach to Risk Assessment of Aircraft Electrical Wiring Interconnect System [ J ]. Journal of Air- craft,2011,48:1888 - 1893.
9Ewen Denney, Ganesh Pai, Corey Ippolitd, et al. An Interated Safety and Systems Engineering Methodology for Small Un- manned Aircraft Systems [ R ]. AIAA - 2012 - 2572,2012.
10Mark S Saglimbene. Reliability Analysis Techniques:How They Relate To Aircraft Certification [ Z ]. IEEE, Reliability and Maintainability Symposium,2009:218 - 222.