汽车涂装生产线建设的EPC模式探究 被引量:2

Exploration on the EPC Mode of the Construction of New Automobile Painting Line
下载PDF
导出
摘要 结合某公司新工厂涂装生产线建设经验,介绍了工程总承包模式(EPC);在涂装线的规划设计阶段,汽车厂家应结合自身状况选择合适的承包商,签订技术协议;在设备安装阶段,做好施工过程管理,把握工程质量;在工程调试管理阶段,认真进行单机调试、连机调试、工艺调试,保证项目顺利完成。 Combined with the construction experience of the new factory painting line, engineering procurement construction (EPC) mode is introduced. In the planning and design stage, the ear manufacturers should choose the right contractor accordance with their own conditions, and then sign the technical agreement. In the equipment installation stage, the project construction preparation and construction management must be completed; the project quality should also be grasped. In the engineering commissioning management stage, single machine debugging, machine debugging and process debugging should be done carefully to ensure the successful completion of the project.
出处 《现代涂料与涂装》 CAS 2017年第8期56-58,共3页 Modern Paint & Finishing
关键词 工程总承包模式(EPC) 工程施工管理 工程调试管理 engineering procurement construction (EPC) engineering construction management engineeringcommissioning management
  • 相关文献

参考文献5

二级参考文献12

  • 1乌云娜,刘芳.工程项目管理前期规划中WBS的应用[J].建筑经济,2006,27(S2):110-112. 被引量:12
  • 2ISO 12944-2-2007 色漆和清漆--防护漆体系对钢结构的防腐蚀保护,第2部分,环境分类[S].2007.
  • 3ISO 12944-1-2007色漆和清漆--防护漆体系对钢结构的防腐蚀保护,第1部分,总则[S].2007.
  • 4ISO 12944-5-2007色漆和清漆--防护漆体系对钢结构的防腐蚀保护,第5部分,防护涂层体系[S].2007.
  • 5ISO 8501-1-2007涂料及其它相关产品使用前钢底材的处理--表面清洁度的目测评定,第1部分,对完全去除旧涂层后未涂装钢底材的除锈等级和处理等级[S].2007.
  • 6ISO 8503-2007抛丸除锈的钢结构的表面粗糙度分类[S].2007.
  • 7ASTM-D 2563-1996表面缺陷分类的标准实践[S].1996.
  • 8ASTM-D 4541-2002使用便携式剥离测试仪测量涂层的剥离强度的标准测试方法[S].2002.
  • 9ASTM 3359-2002胶带法测试粘结力的标准测试方法[S].2002.
  • 10田元福.建设工程项目管理[M]北京:清华大学出版社,2010.

共引文献2

同被引文献6

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部