摘要
介绍了包钢炼钢厂原平炉厂房改造成转炉厂房设计过程、方法及设计关键点 。
The design process, methods, key process, design draft and some matters need attention for changing open-hearth plant to converter plant at Baotou Steel are introduced in this paper.
出处
《包钢科技》
2002年第4期63-66,共4页
Science & Technology of Baotou Steel
关键词
排架结构
加固
炼钢厂
土建设计
bent construction
reform
reinforcement
design