通过对锦屏一级水电站坝基帷幕灌浆施工效果进行分析研究,阐述了在复杂地质条件下坝基加固处理帷幕灌浆施工工艺的选择及采取的应对措施。
In this paper,analysis is performed for curtain grouting construction effect in dam foundation at hydropower station. Corresponding measures are given in curtain grouting construction technique selection and technology used for dam foundation stabilization treatment under complex geological conditions.
出处
《四川水力发电》
2017年第4期38-40,共3页
Sichuan Hydropower
关键词
锦屏一级水电站
三角区域
帷幕灌浆
施工技术
Jinping I hydropower station
triangle area
curtain grouting
construction technology