哈尔乌素露天煤矿破碎站移设规划研究 被引量:3

Research on transfer plan of crushing station in Ha'erwusu Open-pit Coal Mine
下载PDF
导出
摘要 根据生产现状,进行移设规划研究。提出了横向和纵向上技术可行的多个布置方案,建立数学模型,并对各方案的技术可行性、经济合理性和对远期的影响进行了研究论证,最终确定了破碎站下一个合理布置位置为地表境界南部+1 075 m水平南坪沟附近,最优移设步距为2.05km,移设周期为5 a左右。 According to the production status, the article carries out transfer planning research, proposes a number of layout schemes which are feasible in the horizontal and vertical directions, and establishes mathematical model, studies and demonstrates the technical feasibility, economic rationality and long-term impact of the various programs. The final reasonable location of the crushing station is for the surface of the south +1 075 m level near Nanpinggou. The optimal shift step distance is 2.05 km, and the shift period is about 5 years.
出处 《露天采矿技术》 CAS 2017年第8期5-9,共5页 Opencast Mining Technology
基金 中国煤炭科工集团科技创新基金面上项目资助(2016ZYMS019)
关键词 破碎站 移设规划 移设步距 crushing station transfer planning shift step distance
  • 相关文献

参考文献7

二级参考文献20

共引文献54

同被引文献13

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部