摘要
本文结合山东省日照市北水南调三期供水工程安装大口径PCCP管材的经验,介绍了此工程管道施工工序以及施工过程装卸、运输、堆放的注意事项,总结了大口径PCCP管道铺设对接的技术要点,并提出了相关施工的工程建议,可为其他工程提供参考。
In the paper, the experience of Shandong Rizhao North-to-South Water Transfer Stage m Water Supply Project in installation of large-caliber PCCP pipeline is combined. The pipeline construction procedures of the project and precautions in loading and unloading, transport and storage during construction are introduced. Technical keys of large- caliber PCCP pipeline pavement and docking are summarized. Project suggestions of related construction are proposed as reference in other projects.
出处
《水利建设与管理》
2017年第8期11-15,共5页
Water Conservancy Construction and Management
关键词
大口径PCCP管道
施工
技术要点
large-caliber PCCP pipeline
construction
technical keys