摘要
三峡巴基斯坦风力发电二期项目是三峡集团继三峡巴基斯坦风力发电一期项目之后投资实施的风力发电项目,由上海勘测设计研究院有限公司承接的海外EPC总承包项目,属于国家一带一路经济走廊建设项目,在促进中巴友谊和解决当地电力资源匮乏问题上有积极作用,战略意义重大。因此,严抓混凝土施工质量成为实施此项目的重中之重,本文从混凝土主要施工工艺和温控措施着手,提出控制要点,对类似项目有借鉴作用。
The Three Gorges Pakistan Wind Power Stage II Project is a wind power generation project which is invested and implemented by The Three Gorges Group after The Three Gorges Pakistan wind power stage I project. The overseas EPC general contracting project undertaken by Shanghai Investigation, Research and Design Institute Co., Ltd. belongs to a construction project of national one belt and one road economic corridor, which plays an active role in promoting Sino- Pakistan friendship and solving the problem of insufficient local electric power resources with great significance. Therefore, strict control of concrete construction quality becomes the focus of implementing the project. In the paper, control keys are proposed from the aspects of concrete main construction technology and temperature control measures, thereby it has reference role to similar projects.
出处
《水利建设与管理》
2017年第8期19-22,共4页
Water Conservancy Construction and Management
关键词
大体积混凝土
施工工艺
温控措施
mass concrete
construction technology
temperature control measures