第三系富水泥质弱胶结粉细砂岩隧道施工关键技术 被引量:6

The Key Technology of the Construction of the Tertiary Water-rich and Weakly Cemented Sandstone Tunnel
下载PDF
导出
摘要 针对兰渝铁路桃树坪和胡麻岭隧道第三系富水泥质弱胶结粉细砂岩施工中出现的问题,通过对围岩物性、力学参数和特殊复杂水稳特性的研究,揭示了第三系富水泥质弱胶结砂岩工程特性和水稳特性;结合现场工程试验,确定了"重降水、密导管、强支护、辅注浆、快挖快支快封闭"的关键施工技术,确保了施工安全. In view of the problems existing in the construction of the tertiary water-rich and weakly cemented sandstone in Taoshuping Tunnel and Humaling Tunnel on Lanzhou-Chongqing Rail- way, the surrounding rock properties, mechanical parameters and special complex water stability are studied to reveal the characteristics of engineering and water stability of the tertiary waterrich and weakly cemented sandstone. Combined with the field engineering test,the key construc- tion techniques of valuing precipitation, dense conduit, strong support, auxiliary grouting, quick excavation,quick support and quick closure are determined so as to ensure the safety of construc- tion.
作者 熊春庚 XIONG Chun-geng(Lanzhou-Chongqing Railway Co. , Ltd. ,Lanzhou 730099,Chin)
出处 《兰州交通大学学报》 CAS 2017年第4期60-66,共7页 Journal of Lanzhou Jiaotong University
关键词 富水 粉细砂岩 隧道 施工技术 water-rich fine siltstone tunnel construction technology
  • 相关文献

参考文献7

二级参考文献44

  • 1马涛.浅埋隧道塌方处治方法研究[J].岩石力学与工程学报,2006,25(z2):3976-3981. 被引量:63
  • 2李晓红,李登新,靳晓光,顾义磊.初期支护对软岩隧道围岩稳定性和位移影响分析[J].岩土力学,2005,26(8):1207-1210. 被引量:59
  • 3蒋良文,易勇进,贾中明.圆梁山隧道毛坝向斜深埋大型充填溶洞及其形成机制分析[J].铁道工程学报,2007,24(4):53-60. 被引量:20
  • 4中华人民共和国铁道部.TZ204-2008铁路隧道工程施工技术指南[s].北京:中国铁道出版社,2008.
  • 5中华人民共和国铁道部.TB10101-2009/J961-2009.铁路工程测量规范[S].北京:中国铁道出版社,2010.
  • 6国家技术监督局,中华人民共和国建设部.GB50218-94工程岩体分级标准[S].北京:中国标准出版社,1994.
  • 7中华人民共和国铁道部.TB10012-2007铁路工程地质勘察规范[S].北京:中国铁道出版社,2007.
  • 8甘肃省地质矿产局.甘肃省区域地质志[M].北京:地质出版社,1989.395-400.
  • 9曾祥勇,黄志鹏,邓安福,等.红层软岩强度特征的研究[C]//第8次全国岩石力学与工程学术大会论文集.北京:科学出版社,2004:198-201.
  • 10铁道第一勘察设计院.铁路工程地质手册[M].北京:中国铁道出版社,1999.

共引文献95

同被引文献50

引证文献6

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部