针对水利项目投资大、工期紧迫的现状,从多方面深入分析勘察、设计、施工一体化招标模式的优缺点,建议建设单位要视项目的具体情况,选择最合适的招标模式。
Aiming at the present situation of large investment and limited construction period of hydraulic engineering project, the article analyzes the advantage and disadvantage of survey, design and construction integration bidding mode from many aspects and proposes the construction units to select the most suitable bidding mode according to the detailed conditions of the project.