期刊文献+

基于电力市场改革的越南火电厂接入系统二次方案研究

Plan Researching on Power Plant Accessing Based on Vietnam Power Market Revolution
下载PDF
导出
摘要 文章基于近几年多个我国设计的越南火电厂项目的经验,从电厂接入系统设计中电气二次专业角度,对中越两国大型火电厂设计的异同进行了介绍,总结了在电力市场改革的形势下,越南电源项目系统接入设计时的难点和重点,包括电气控制、监视、继电保护、关口计量、SCADA等方面,为厂网接口工作的顺利展开提供了宝贵的经验总结和技术方案参考。 This dissertation was a conclusion based on the experience on the engineer of Vietnamese thermal power plant.For power plant engineering,the grid accessing is a job that includes many interface between the power plant and power grid company.In this dissertation,the conclusion introduced the difference on grid accessing of power plant between China and Vietnam, which includes electrical controlling, monitoring, relay protection, tariff metering, SCADA and so on.The conclusion could be a reference plan for other Vietnamese power plant project.
出处 《企业技术开发》 2017年第8期133-134,148,共3页 Technological Development of Enterprise
关键词 一带一路 电厂 接入系统 电气二次 the Belt and Road power plant system accessing electrical controlling
  • 相关文献

参考文献1

二级参考文献7

  • 1World Bank. Power strategy managing growth and reform of Vietnam[ R]. 2006.
  • 2Passelergue J C, Ammari S, Galzin C, et al. Introduction of a competitive power pool in Vietnam. Power Engineering Conference, 2005. IPEC 2005. The 7th International 29 Nov. 2 Dec. 2005 : 1-6.
  • 3Approving the roadmap and conditions for formation and development of different levels of the electricity market in Vietnam [S]. Decision, 26/2006/QD - TTg of Jan 26, 2006.
  • 4Haycock R T. Electricity system in Vietnam. Power Engineering Journal, Vol. 9, Issue 1, Feb. 1995:27-29.
  • 5Vietnam Electricity. Annual report 2005-2006 [ R].
  • 6Wyatt A B. Power sector restructuring in Vietnam : the construction and transfer of risk.
  • 7Construction schedule of the competitive electricity production market in Vietnam [ S]. Decision, 3956/2006/QD-BCN of Dec. 29, 2006.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部