摘要
针对高速公路勘察设计过程中软基调查、地质勘察漏项,导致施工期间需要重新计算软基处理费用问题,在对模糊数学方法进行介绍的基础上,以某高速公路施工标段,拟采用山皮石土换填方案的新发现软基项目为例进行了研究。
Aiming at the problem of the re - calculated cost of soft foundation treatment caused by missing items during the soft foundation investigation and geology survey in the expressway process of survey and design, based on the introduction of the fuzzy mathematics method, taking the newly discovered soft foundation project which intended to be replaced by mountain gravel as an example, the study is conducted.
关键词
模糊数学
高速公路
软基处理
fuzzy mathematics
expressway
soft foun -dation treatment