期刊文献+

循环流化床锅炉返料系统风机运行方式研究 被引量:2

Study on Fan Operation Mode of Circulating Fluidized Bed Boiler Material Return System
下载PDF
导出
摘要 为降低机组厂用电、节约投资成本,对某350 MW超临界循环流化床发电机组进行单台高压流化风机运行调整试验,并分析了该运行方式的可行性及效果。试验结果表明,单台高压流化风机能够满足机组全负荷段的运行要求;与2台运行比较,节电效果明显。在后续基建相关类型机组时,设计阶段应重新考虑高压流化风机的出力及配置,避免投资浪费和增加运行成本。 In order to reduce the power consumption of the unit to save cost, a single high pressure fluidized fan operation adjustment test was carried out for a 350 MW supercritical circulating fluidized bed generator unit, and the feasibility and effect of the operation mode were analyzed. The experimental results show that a single high pressure fluidizing fan can meet the requirements of the unit operating with whole load. Compared with two fans in operation, the energy-saving effect is obvious. When establishing similar units thereafter, the output and configuration of high pressure fluidizing fan should be reconsidered during design stage to avoid excessive investment.
出处 《山西电力》 2017年第4期60-62,共3页 Shanxi Electric Power
关键词 循环流化床锅炉 流化风机 返料系统 运行方式 circulating fluidized bed boiler fluidizing fans material return system operation mode
  • 相关文献

同被引文献20

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部